Update:
Got the painting done.

I had an issue with one of my switches for my turnouts. Everytime I threw the switch for one particular turnout into the diversion route it would short out the whole layout..(Not Good

) So I checked all the wiring and found no problems with it.
I then pulled the turnout from the layout that that switch was using and checked all the wires on the underside of it. Again found nothing wrong. I then started looking at the insulated rails on the turnout itself. I noticed that one of the rails looked like it was contacting a rail where it shouldn't be. So I made the gaps a little bigger on all the break points on the turnout.
I reinstalled it and hookup up all the wires and tested it. and the short was gone. Just another day of model railroading...

Oh it was a Bachmann E-Z track turnout.