I'm planning on a small 4x4 HO layout. I know that this is the smallest space in which I can put an HO layout and was wondering if I can do 2 train operation if I use a couple of short sidings with short trains. I'd like to run the trains separately, using the sidings to hold one train while the other one runs. I know that I'll have to use short stock. Can anyone tell me if it's possible and if so where I can find detailed instructions to wire it correctly?
Thanks much!
Thanks much!