My E-Z Command controller recently burned out after about three years use and so I replaced it with a new one but this burned out almost immediately. I run a mixture of DCC and analog engines - both the burn-outs occurred running the latter. Would I be better off running the analogs via a DC controller powered from the DC output on the E-Z controller rather than using channel 10?