I have switch and power 10 ft extensions that are 5-7 feet longer than I need. Do I need to cut and splice, or can I just push the extra under the table?
Quote from: JCL on November 26, 2014, 05:25:02 PM
I have switch and power 10 ft extensions that are 5-7 feet longer than I need. Do I need to cut and splice, or can I just push the extra under the table?
Custom cut all wiring to suit and run it under whatever you are supporting your track on. Be that a 4 x 8 sheet of plywood, or open grid, or girder.
Cheers
Roger T.
Hi JCL,
Consider the longer the wire, the more resistance it places on the circuit.
The extra wire is not beneficial.
A couple of extra inches 2 - 3 is OK.
Several extra feet... not so much.