another project for those who have a overhead electric railroad. take a ho two motor 44 ton and turn it into a ge steeple cab.
http://www.rgspemkt.com/Parts-1.html
lex
I think those Steeple cab bodies have been out of production for 10 years or more.
Quote from: RAM on November 18, 2009, 11:50:22 PM
I think those Steeple cab bodies have been out of production for 10 years or more.
I've seen them around.
I am a MAJOR electric modeler (nearly half my roster is electric, which is why i am a bachmann customer, lol). I'm sure i've posted some pictures of my catenary efforts (none that great, but i've got an improved jig and materials ready to assemble).
I actually want to get their Baldwin electric switcher. they were a little more heavy duty (Class one use), so it would make sense free-lanced on my layout. They even lasted for a fairly long time.
I'm having a hard time finding where to order though. gotta grab me a baldwin Class D.
might be nothing. no idea
http://www.mrrwarehouse.com/
lex