Sorry but I don't seem to be able to reply to any more posts..
Thanks to everyone for their responses.
Sewing machine oil, I'll definitely pick some up. I was working on the road today (on the Honolulu Rail Project) and there was a sewing machine shop right at the intersection.
I cleaned my track, but there are still a couple of locations where my train stalls and the lights on the cars flicker. I decided to order a new track consisting of 12 curved sections and 2 straights, exactly like my existing track. I also bought a new controller.
My train consists of 1 loco, 1 engine and 7 cars which basically envelops my entire track.
Thanks again.
Thanks to everyone for their responses.
Sewing machine oil, I'll definitely pick some up. I was working on the road today (on the Honolulu Rail Project) and there was a sewing machine shop right at the intersection.
I cleaned my track, but there are still a couple of locations where my train stalls and the lights on the cars flicker. I decided to order a new track consisting of 12 curved sections and 2 straights, exactly like my existing track. I also bought a new controller.
My train consists of 1 loco, 1 engine and 7 cars which basically envelops my entire track.
Thanks again.