Things have slowed down as I ran out of right hand switches.
However, these two photos show a changed to the west end of the yard.
First photos show the 2-6-0 sitting on the yard lead.
Second photo shows where I've installed a new switch, almost right under where the 2-6-0 was sitting, that will lead to a freight shed/LCL transfer platform. When I've completed the yard tracks, shown in the background, and when I've built the freighthouse and transfer platform, I'll come back and add the second track so that the LCL platform is between the two tracks.
Original yard lead: -
(http://i94.photobucket.com/albums/l99/rogertra/The%20new%20Great%20Eastern%20Railway/DSCF0736.jpg)
Revised yard lead: -
(http://i94.photobucket.com/albums/l99/rogertra/The%20new%20Great%20Eastern%20Railway/DSCF0744.jpg)
Quote from: rogertra on June 09, 2012, 05:52:56 PM
Things have slowed down as I ran out of right hand switches.
Gary-
Just hold your switches in front of a mirror and you'll have all of the right handers you need.
-- D