Bachmann Online Forum

Discussion Boards => HO => Topic started by: sedfred on March 20, 2016, 06:39:08 PM

Title: 2 X 8 layout update
Post by: sedfred on March 20, 2016, 06:39:08 PM
the benchwork is nearly complete. http://i376.photobucket.com/albums/oo210/i10dtowinthebrantfordrailfan/SAM_3151_zpscaa2q4ba.jpg  i have also modified the trackplan a bit. it now has a mainline at the bottom that connects to the yard. this allows for a proper arrival and departure track and allows trains of up to 8 cars.  it can handle 16 cars in total. it will also have operating wig wags with sound. i have replaced the grain elevator with a coal yard. i can't show a picture of it because of techical issues but you probably get the idea