Bachmann Online Forum

Discussion Boards => On30 => Topic started by: Steve Magee on December 05, 2015, 05:01:43 AM

Title: Lumber Mountain RR layout pics
Post by: Steve Magee on December 05, 2015, 05:01:43 AM
It has been sometime since I uploaded a pic or two of my layout, but more can be seen on the local NMRA region layout tour page:

http://www.nmra.org.au/Layout_Tours/Magee/index.html

Cheers all

Steve Magee
Newcastle NSW Aust
Title: Re: Lumber Mountain RR layout pics
Post by: Ken Clark on December 05, 2015, 10:18:19 AM

  Steve

   A nice layout and not overly crowded with to many things to see. like the switchback, may need to add one to my layout one day. Oh and build a fairly large mining complex for it to
serve.

  Ken Clark
   GWN
Title: Re: Lumber Mountain RR layout pics
Post by: fred lundgren on December 06, 2015, 12:08:14 PM
Really nice layout.
Any lessons learned??
Thanks
Title: Re: Lumber Mountain RR layout pics
Post by: ScottyB on December 06, 2015, 06:12:18 PM
Wonderful! Thanks for sharing!

Scott
Title: Re: Lumber Mountain RR layout pics
Post by: Steve Magee on December 07, 2015, 07:29:25 AM
Thanks all for the kind comments.

For Fred, a bit of my philosophy behind the layout was in the cover page to the pics, not sure if you saw that, but it is at: http://www.nmra.org.au/Layout_Tours/Magee/indexb.html. Only other comment I would make is to not overfill the layout room. I did this on my previous HO layout in the same space, you had to be part crab to sidle around in it and I could not have friends over to operate the layout. So the middle of the room is free space as the layout plan shows.

I have since developed an operations procedure for the layout which identifies "turns" and ascribes a loco to it. Because it is not a killer layout with hundreds of box cars, it focuses on correct operation of the train and locomotive operation (all locos fitted with sound decoders). It includes badges for everyone to wear to show their task/job (mine is General Overall Director - G.O.D.) but that is my weird sense of humor. :-).  I have a copy of the operations plan, which is bound into folder form for operators to study on the Lumber Mountain RR. It is in Open Office format, so if you want a copy contact me by email and I will send a copy.

Cheers

Steve Magee
Newcastle NSW Aust
Title: Re: Lumber Mountain RR layout pics
Post by: fred lundgren on December 07, 2015, 05:40:25 PM
Thank you.
I read your operation at your web site.
I gather the loads are brought by geared engines to the midway point and the mallets take them to the log pond. Empties are just the reverse.
How to the loads at the log pond get back to the falling area?? By hand or just hauled back?
Nice layout!
Title: Re: Lumber Mountain RR layout pics
Post by: Steve Magee on December 12, 2015, 04:27:25 AM
Load transhipment (from log dump track back to falling area) is normally done by me, by hand, using my General Overall Director standing. Can get a bit hectic when both log trains are running and there is a delay for whatever reason on the high line! :-)

Steve Magee