Bachmann Online Forum

Discussion Boards => HO => Topic started by: Hunt on June 10, 2018, 03:47:44 PM

Title: Bachmann turnout wiring video
Post by: Hunt on June 10, 2018, 03:47:44 PM
Wiring E-Z Track powered Remote Turnouts video
Click Here  (https://youtu.be/H9JqOKclC9s)




Not shown is method to inset red power wire electrical spade connector into the Bachmann power pack push to open, release to close ACCESSORIES 16V AC terminal. What is shown is another connection method after spade connector removed and red power wire end stripped. 

Remote Turnout - Left (HO Scale) shown in video with DIRECTIONAL BOX LG. (All Scales)
Switch Box Type B. However, that turnout is sold packaged with DIRECTIONAL BOX SM.(All Scales) Switch Box Type A





Click Here  (http://www.bachmanntrains.com/home-usa/dwg/dwgs/HO__6_Turnouts_Instructions.pdf) for written instruction with illustrations.

Title: Re: Bachmann turnout wiring video
Post by: Hunt on June 16, 2018, 12:33:52 PM
UPDATE  --
Video link in above reply  has been removed by Bachmann and replaced with
Click Here  (https://youtu.be/NvQgLHt2ul8) Bachmann video


This video some observations:

Revealed new product,  Multi-Accessory Power Supply

Nomenclature not consistent with advertised product description - Transformer interchanged for Speed Controller, which is part of Power Pack and Speed Controller

Again, Remote Turnout - Left (HO Scale) shown in video with DIRECTIONAL BOX LG. (All Scales) Switch Box Type B. However, this turnout is sold packaged with DIRECTIONAL BOX SM.(All Scales) Switch Box Type A