https://www.facebook.com/seen.everything/videos/1517968498307682/ (https://www.facebook.com/seen.everything/videos/1517968498307682/)
That's part 7 of an 8 part series. For those who don't Face Book, all 8 parts can be seen as one video here:
https://www.youtube.com/watch?v=dRFRsKobN9I
Len
Thanks Len. I was trying to find it on Youtube so I didn't have to use the FB one. I was just amazed at the flexibility of the rails.
Me too. When they were pulling the joint bars on the old rail, I thought they would be installing welded rail. So I was really surprised to see them drilling joint bar holes in the new rail.
Len
They were installing welded rail. So every half mile or so they need to have a joint. rail expand and contract.