I plan to create an N gauge layout using 12 remote switches. Are there any constraints I need to be aware of or can I just plug them all together in series? Estimated track length is 280 inches if that makes a difference.
Great question Gnu! I don't have an answer but I would have the same question as I am planning a layout with 7 turnouts and 4 crossovers so 15 switches.
Dear Gnu,
Since switches generally throw one or two at a time, and the draw is momentary,
you can use as many as you need.
Have fun!
the Bach-man
Some people use a CDU like a Circuitron Snapper.
Rich
Thanks, everyone!